Home / Claims and dates / PC-037
Priority claim · PC-037
Eden Engineering research note released 22 February 2026; full specification published 19 September 2026
The claim - verbatim
Michael Darius Eastwood first entered a conceptual Eden Engineering public research note into the public record on 22 February 2026 under OSF DOI 10.17605/OSF.IO/6C5XB. The greatly expanded working specification and its rendered PDF were withdrawn on 14 July 2026 pending a disclosure review; that decision was reversed on 19 September 2026 and the full specification is the current public record. Hardware framing: safety constraints at hardware level through cryptographic tokens in silicon, at TRL 0 to 1 with no prototype; the hardware specification is published in full as Eden Engineering.
Anchored evidence
- OSF DOI 10.17605/OSF.IO/6C5XB
- research/priority.json priorityChain position 9
- research/papers/eden-engineering.html (JSON-LD datePublished 2026-02-22; historical record and withdrawal notice)
- research/data/priority-record.json claim_id 'eden-engineering' updated '2026-07-14' with pdf null
Limits and citation guidance - what this claim does not support, and how to cite it
Limits. The expanded specification was withdrawn on 14 July 2026 during a disclosure review; the author reversed that decision on 19 September 2026, and it has been published in full since then. This claim dates the research note of 22 February 2026, not the later specification.
Verify this claim. The source register is /research/priority.json (this claim is PC-037 in claimsLedger[]). The public ledger view is /priority-claims. The verification method for redacted evidence/... pointers is documented at /research/evidence-spine.html. Available public programme records can be inspected at osf.io/6c5xb (DOI 10.17605/OSF.IO/6C5XB). Their availability is not a declaration that every claim has been independently verified.
← Back to Claims and dates · public ledger view · publication-oriented priority record · home.